Power Up Your Study Prep: Black Friday 75% Discount! Use coupon code below to save! - Ends in 0d 00h 00m 00s - Coupon code: big75certs

Free and Premium Huawei H19-132_V1.0 Dumps Questions Answers

HCSA-Presales-Data Center Facility (Modular DC) V1.0 Questions and Answers

Question 1

FusionModule2000 supports facial recognition for opening the aisle doors.

Options:

A.

True

B.

False

Buy Now
Question 2

Which of the following tasks does SCT support?

Select All that Apply.

Options:

A.

Browsing products

B.

Setting discount

C.

Creating quotations

D.

Submitting quotations

Question 3

The SCT is a fast, smart, and simple online tool that makes configuration and quotation easier.

Options:

A.

True

B.

False

Question 4

The lithium-battery version of FusionDC1000A-40ft-IT is equipped with __________ IT racks in a 2N configuration.

Options:

A.

7

B.

6

C.

9

D.

8

Question 5

Regarding the integrated UPS used in FusionModule2000, which of the following statements are correct?

Select All that Apply.

Options:

A.

In FusionModule2000 version 6.0, the integrated UPS supports continuous cooling for air conditioners.

B.

The integrated UPS uses Huawei's self-developed high-density circuit breakers, reducing the size by 25%, thus allowing more power modules to be accommodated.

C.

The integrated UPS combines UPS input, output, air conditioning power distribution, and IT power distribution, saving 1-2 cabinet spaces compared to traditional solutions.

D.

Huawei integrated UPS has a single cabinet power capacity of up to 180 kW.

Question 6

FusionDC1000A's anti-seismic rating reaches _____.

Options:

A.

9

B.

10

C.

12

D.

11

Question 7

How many typical cabinet configurations does the FusionModule800 5.0 offer to satisfy different customer requirements for standard 380V power?

Options:

A.

5

B.

6

C.

7

D.

4

Question 8

The FusionModule800 front door uses a double-layer glass door. Which of the following functions can it provide?

Select All that Apply.

Options:

A.

Separate hot and cold air

B.

Provide greater structural strength

C.

Reduce noise

Question 9

In the FusionDC1000A-40ft N+X scenario, the UPS supports two ATS inputs and has a maximum power capacity of 60 kVA (with 2+0 redundancy).

Options:

A.

True

B.

False

Question 10

Which features are included in the cooling system of the FusionDC1000A-40ft-IT?

Select All that Apply.

Options:

A.

Wet film humidification

B.

Row-level cooling

C.

"0" Condensation Risk

Question 11

Which systems are prefabricated and integrated into the FusionDC1000A-40ft?

Select All that Apply.

Options:

A.

Rack

B.

Cooling

C.

Power

D.

Fire Protection

E.

Management

Question 12

The FusionModule500 cabinet measures 600 × 1100 × 2000 mm. Its rack-mounted cooling unit has a 3.5 kW cooling capacity and uses R410A refrigerant.

Options:

A.

True

B.

False

Question 13

What cooling mode is supported by FusionModule800?

Options:

A.

Water-cooling

B.

Air-cooling

C.

Liquid-cooling

Question 14

In-row air-cooled cooling is utilized in the FusionDC1000A-40ft-IT solution.

Options:

A.

True

B.

False

Question 15

If you are unfamiliar with Huawei products and the quotation process, you are advised to create a quotation through the shopping cart.

Options:

A.

True

B.

False

Question 16

After a BOQ is created, you can promptly set its basic information, such as the BOQ name, BOQ type, office, and remarks.

Options:

A.

True

B.

False

Question 17

Which of the following statements are incorrect about the “capability of safety and quality planning” among the “four capabilities” of SQA professional skills?

Select All that Apply.

Options:

A.

Quality planning is the process of identifying and developing quality objectives for projects and products, as well as the techniques, processes, tools, key measures, etc., required to achieve these objectives and to ensure that the end result meets customer requirements.

B.

SQA is the primary owner for project quality planning.

C.

Quality planning is independently completed by the SQA.

D.

With delivery as the ultimate goal, make the requirements clear to the team in advance by planning activities. Preparedness ensures success, while unpreparedness spells failure.

Question 18

When submitting a BOQ, a prompt stating“Dynamic package instance part number is missing”appears. What should I do next?

Options:

A.

Ignore the prompt and continue to submit the BOQ

B.

Insert a replacement part number manually

C.

Delete the error part number

D.

Apply for package part

Question 19

The FusionModule800 uses the typical configuration mode, with core components pre-installed at the factory. How long does it take to deploy services on site?

Options:

A.

4 hours

B.

2 days

C.

1 day

Question 20

An in-row air-cooling unit is used in the FusionDC1000A-40ft-IT solution.

Options:

A.

True

B.

False

Question 21

When exporting a BOQ, Meta CPQ validates the BOQ. If an error alarm is present in the configuration quotation, you can ignore the error and continue exporting the BOQ.

Options:

A.

True

B.

False

Question 22

After obtaining the total product volume and weight details in the Meta CPQ BOQ, to which of the following businesses can the BOQ be submitted?

Options:

A.

Logistics goods volume estimation

B.

Draft

C.

Commerce application

D.

Manual review (exporting databases)

Question 23

The FusionDC1000A solution uses a __________ height module.

Options:

A.

5.2m

B.

2.9m

C.

3.6m

D.

4.15m

Question 24

What is the maximum power capacity of one FusionModule800 module?

Options:

A.

25kW

B.

10kW

C.

40kW

Question 25

Which of the following products constitute the primary components of the FusionModule2000 power supply and distribution system?

Select All that Apply.

Options:

A.

NetCol5000

B.

NetEco6000

C.

UPS

D.

ECC800-Pro

E.

PDC (Power distribution cabinet)

Question 26

A configuration model can be added from Favorites to any BOQ.

Options:

A.

True

B.

False

Question 27

Which of the following operations must be completed when applying for an account and permission for SCT?

Select All that Apply.

Options:

A.

Select permissions

B.

Register and activate a Huawei uniportal account

C.

Associate your account with your company's account

Question 28

Which of the following is not a recommended display range on the Configuration Result tab page?

Options:

A.

Quantity = 0

B.

Quantity > 0

C.

Quantity > 0 + Manual modification

D.

Manual modification

Question 29

Which of the following verification outcomes does not affect BOQ submission?

Options:

A.

Controlled part

B.

EOP part

C.

Configuration error

D.

Alarm configuration [intended: configuration warning]

Question 30

According to the training materials, which safety-management phase is described by the following statement? Statement: Proactively correct other people’s violations, and demonstrate concern for others’ safety, team honor, and safety beyond work.

Options:

A.

Supervision and management

B.

Team management

C.

By instinct

D.

Self-management

Question 31

Which advantages do modular data centers have over traditional data centers?

Select All that Apply.

Options:

A.

Flexible Expansion

B.

High power density

C.

Energy saving

D.

Rapid Deployment