API 580 - Risk Based Inspection Questions and Answers

Question 1

One of the significant differences between qualitative and semi-quantitative COF analysis for RBI is that the results of a semi-quantitative analysis are usually:

Options:

A.

numeric

B.

estimated

C.

probabilistic

D.

alpha characters

Buy Now
Question 2

Who shall be responsible for assessing the types of damage mechanisms and their applicability and severity to the equipment?

Options:

A.

The risk analyst leading the team

B.

The RBI assessment team

C.

A corrosion specialist

D.

The inspector or inspection specialist

Question 3

An iso-risk line on a risk plot is a line:

Options:

A.

of constant risk.

B.

of same-risk consequence.

C.

showing direction of increasing risk.

D.

of same-risk probability.

Question 4

Risk mitigation is defined as:

Options:

A.

estimated risk before and after repairs and replacements.

B.

finding, listing, and characterizing elements of risk management.

C.

modifying inputs to the risk matrix.

D.

selecting and implementing measures to modify risk.

Question 5

Which of the following statements is accurate regarding data quality relative to the type of RBI assessment selected?

Options:

A.

Data validation is most important when quantitative RBI is being applied.

B.

Data quality is equally important no matter what type of assessment is selected.

C.

Data quality is more important for semi-quantitative assessments vs. qualitative assessments.

D.

Data accuracy in qualitative RBI is not as important because risks are relative, not absolute.

Question 6

The continuum of RBI approaches is the:

Options:

A.

continuous improvement cycle involved in RBI reassessment.

B.

variance from low to high in detail of RBI analysis.

C.

range between data collection and risk mitigation for RBI.

D.

range between qualitative and quantitative RBI.

Question 7

One of the key elements of an inspection plan is:

Options:

A.

probability of failure.

B.

examination methods to be used.

C.

repairs necessary to reduce risk.

D.

consequence of failure.

Question 8

When equipment has deteriorated to such an extent that the risk of failure cannot be managed and held to an acceptable level, often the only way to mitigate risk is to:

Options:

A.

repair/replace the equipment.

B.

perform a fitness-for-service analysis.

C.

shorten the inspection interval.

D.

rerate the equipment.

Question 9

Which of the following would be the minimum expectations of contractors hired to implement an RBI program?

Options:

A.

Certification in accordance with API RP 580

B.

Documented training in damage mechanisms

C.

Certification of corrosion/materials specialist to API RP 571

D.

Documented training and suitably qualified personnel

Question 10

Risk assessment is defined as the:

Options:

A.

process to find, list, and characterize elements of risk.

B.

systematic use of information to estimate risk and conduct risk evaluation.

C.

coordinated activities to direct and control risk in an organization.

D.

process used to assign values to the probability and consequence of risk.

Question 11

Once organizing the work process for RBI program planning has been completed, the next step is the identification of the:

Options:

A.

appropriate mitigation activities that will be considered.

B.

credible damage mechanisms and failure modes.

C.

applicable design and inspection codes and standards.

D.

data and information required to be collected for RBI analysis.

Question 12

What does sensitivity analysis typically involve?

Options:

A.

Checking the impact of having more than one damage mechanism progressing toward failure at the same time

B.

Determining whether a flammable release is more likely to result in an explosion versus a fire versus safe dispersion

C.

Reviewing some or all input variables to the risk calculation to determine the overall influence on theresultant risk value

D.

Determining what effect the surrounding community may have on the total consequence of the release to the environment

Question 13

How important is data quality in RBI assessment?

Options:

A.

Equally important for all types

B.

Most important for quantities

C.

Most important for qualitative RBI

D.

Not as important in qualitative RBI

Question 14

Which of the following codes provide requirements and limitations for implementing RBI programs? (Select all that apply)

Options:

A.

API 653

B.

API 573

C.

API 570

D.

API 510

E.

API 578

Question 15

The resources and time required to implement an RBI assessment will vary widely between organizations depending on a number of factors including:

Options:

A.

degree of precision required.

B.

amount of mitigation activities generated.

C.

duration of the turnaround for risk-based inspections to be completed.

D.

whether the risk driver is a consequence of failure or probability of failure.

Question 16

Which of the following has the most direct relation to the relative accuracy of the RBI analysis?

Options:

A.

Data precision

B.

Data quality

C.

Data sources

D.

Data validation

Question 17

Which of the following may make it impractical to reduce some risks to an acceptable level?

Options:

A.

Technology

B.

Labor contracts

C.

Production needs

D.

Regulatory requirements

Question 18

Which aspect of risk assessment is common to all types and levels of RBI?

Options:

A.

Logic models

B.

Risk plots

C.

Expert opinion

D.

Calculated risk levels

Question 19

What method of mitigation is most likely to reduce the amount and rate of release?

Options:

A.

Substitute a less hazardous material

B.

Emergency depressuring capability

C.

Water spray and deluge systems

D.

Spill detectors and containment

Question 20

Why is it important to understand the difference between RBI accuracy and RBI precision?

Options:

A.

RBI precision is more important than RBI accuracy.

B.

RBI accuracy cannot be fully achieved with qualitative RBI analysis.

C.

Quantitative RBI methods are more accurate than qualitative methods.

D.

The implied linkage between RBI accuracy and precision may not exist.

Question 21

Detailed information and data are needed for quantitative RBI in order to:

Options:

A.

make use of logic and physical models.

B.

conduct sensitivity analysis in probability models.

C.

improve the risk rank of an item.

D.

assess the higher risks associated with the release of hazardous fluids.

Question 22

Depending on factors such as the remaining life of the equipment and the type of damage mechanism, risk management through inspection:

Options:

A.

results in a decrease in inspection frequencies.

B.

is the least cost-effective.

C.

may have little or no effect.

D.

is most effective in reducing risk.

Question 23

Inspection alone cannot adequately manage risk for equipment:

Options:

A.

that is nearing end of service life.

B.

with high probability of failure.

C.

that has cracking mechanisms.

D.

frequency dominated risk.

Question 24

In preparing for a future inspection, which of the following assessments can be used to determine what flaws would require repair or replacement?

Options:

A.

RBI

B.

FFS

C.

POF

D.

COF

Question 25

RBI plans identify equipment that does not require inspection or some other form of mitigation because of the acceptable level of risk associated with the equipment's current operation. In this way, inspection and maintenance activities can be:

Options:

A.

more focused and cost effective.

B.

eliminated for all low consequence equipment.

C.

conducted while the equipment is on-line instead of during turnarounds.

D.

shifted to more profitable needs in the plant.

Question 26

Which of the following statements is correct with regard to the potential reduction of inspection cost by using RBI?

Options:

A.

Equipment integrity is the focus.

B.

RBI will eliminate many internal inspections.

C.

On-stream inspections are as effective as internal inspections.

D.

RBI will probably raise the total cost of inspection for a given unit.

Question 27

What is a risk driver?

Options:

A.

The primary contributor(s) responsible for a significant share of a risk value.

B.

The primary identifier(s) used to assist in the acceptance or mitigation of found damage.

C.

The primary element(s) to find, list, and characterize probability of failure.

D.

The primary element(s) to find, list, and characterize consequence of failure.