New Year Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

USGBC LEED-AP-ID+C Exam With Confidence Using Practice Dumps

Exam Code:
LEED-AP-ID+C
Exam Name:
LEED AP Interior Design + Construction (LEED AP ID+C) V4
Vendor:
Questions:
100
Last Updated:
Jan 14, 2026
Exam Status:
Stable
USGBC LEED-AP-ID+C

LEED-AP-ID+C: Leadership in Energy and Environmental Design (LEED) Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the USGBC LEED-AP-ID+C (LEED AP Interior Design + Construction (LEED AP ID+C) V4) exam? Download the most recent USGBC LEED-AP-ID+C braindumps with answers that are 100% real. After downloading the USGBC LEED-AP-ID+C exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the USGBC LEED-AP-ID+C exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the USGBC LEED-AP-ID+C exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (LEED AP Interior Design + Construction (LEED AP ID+C) V4) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA LEED-AP-ID+C test is available at CertsTopics. Before purchasing it, you can also see the USGBC LEED-AP-ID+C practice exam demo.

Related USGBC Exams

LEED AP Interior Design + Construction (LEED AP ID+C) V4 Questions and Answers

Question 1

What is the maximum flow rate a public lavatory faucet may have if a project is pursuing prescriptive compliance for Water Efficiency Prerequisite?

Options:

A.

0.25 gpm (0.9 lpm)

B.

0.4 gpm (1.5 lpm)

C.

0.8 gpm (3.0 lpm)

D.

1.0 gpm (3.8 lpm)

Buy Now
Question 2

Best practices recommend that the LEED AP confirm that minimum program requirements have been met

Options:

A.

as part of the discovery phase

B.

as part of the final certification submittal

C.

after the design phase but before construction

D.

after the Commissioning (Cx) review but before design phase submittal

Question 3

Based on the results of a six-hour waste stream study, the team for an Interior Design and Construction Retail project plans to provide dedicated areas for four recyclable waste streams: cardboard, plastic, metal, and paper.

The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite, Storage and Collection of Recyclables?

Options:

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams