New Year Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

USGBC LEED-AP-ID+C Exam With Confidence Using Practice Dumps

Exam Code:
LEED-AP-ID+C
Exam Name:
LEED AP Interior Design + Construction (LEED AP ID+C) V4
Vendor:
Questions:
100
Last Updated:
Jan 12, 2026
Exam Status:
Stable
USGBC LEED-AP-ID+C

LEED-AP-ID+C: Leadership in Energy and Environmental Design (LEED) Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the USGBC LEED-AP-ID+C (LEED AP Interior Design + Construction (LEED AP ID+C) V4) exam? Download the most recent USGBC LEED-AP-ID+C braindumps with answers that are 100% real. After downloading the USGBC LEED-AP-ID+C exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the USGBC LEED-AP-ID+C exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the USGBC LEED-AP-ID+C exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (LEED AP Interior Design + Construction (LEED AP ID+C) V4) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA LEED-AP-ID+C test is available at CertsTopics. Before purchasing it, you can also see the USGBC LEED-AP-ID+C practice exam demo.

Related USGBC Exams

LEED AP Interior Design + Construction (LEED AP ID+C) V4 Questions and Answers

Question 1

A project is pursuing Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control. Which lighting control could the design team specify to meet the credit requirements for open-office workstations?

Options:

A.

Standard on-off switches at each workstation

B.

Plug-in task light at each workstation that allow for on, off and a 50% light level

C.

Overhead lighting for the open-office space with fully automatic dimming via daylight sensors for the space

D.

Overhead lighting for the open-office space with controls that allow for on, off and a 50% light level for the space

Buy Now
Question 2

In a goal-setting workshop, a project team identifies that teleworking could reduce building area and therefore the required plug loads. What is a requirement for the documentation of the energy-related systems of the Integrative Process worksheet?

Options:

A.

Providing a narrative of one plug load reduction

B.

Providing calculations of only the plug load reduction

C.

Providing explanations of at least two plug load reduction strategies

D.

Providing detailed comparative energy model before completing schematic design to evaluate energy load reduction strategies

Question 3

What primary role does the LEED AP have during the LEED certification process?

Options:

A.

Runs weekly construction meetings

B.

Authors the Owner's Project Requirements (OPR) document

C.

Determines the LEED certification status of the project

D.

Helps project team members understand the rating system