Question 9

An administrator notices that VM replication from ClusterA to ClusterB fails consistently at the same point during the replication job. The following observations are noted by the administrator:

    The Prism dashboard shows the replication job failing during snapshot creation.

    ClusterB storage pool and container usage is under 80%, well below capacity.

    Network latency/Pings between ClusterA and ClusterB averages 3ms, with occasional spikes to 25ms.

    VM event logs indicate frequent I/O timeout errors during the replication window.

    Both clusters are running compatible AOS versions.

What is the most likely cause for the failing replications?

Options:

A.

Misconfigured/Overlapping replication schedules.

B.

Insufficient cluster storage on ClusterB.

C.

Required Nutanix TCP replication ports are blocked.

D.

Network instability impacting snapshot replication.

Question 10

Which two Data Protection technologies are compatible with Self-Service Restore? (Choose two.)

Options:

A.

Nearsync hourly recovery points

B.

Async replication schedules

C.

Synchronous data replication

D.

Volume Group manual snapshot

Question 11

A security team has detected a ransomware attack that began encrypting files on the primary site at 2:00 AM. By 2:45 AM, the primary site is still accessible but workloads are compromised. The administrator needs to recover to a known-good state from before the attack.

Which statement shows the action and reasoning that the administrator should consider?

Options:

A.

Test Failover, to validate the recovery point in isolation before committing to a full failover.

B.

Planned Failover, as the primary site is still accessible and a clean final snapshot can be created before failing over.

C.

Planned Failover, as it guarantees zero data loss by capturing the most current state of all VMs.

D.

Unplanned Failover, as it allows the administrator to select a specific recovery point in time.

Question 12

An administrator executes a Recovery Plan for a set of high-performance VMs configured with SR-IOV network adapters. The VMs failover successfully to the Recovery Cluster.

What is the state of these VMs immediately after the planned failover completes?

Options:

A.

The VMs are recovered in a powered-off state, and the SR-IOV profile is removed.

B.

The VMs are powered on, and SR-IOV is active.

C.

The VMs are powered on, but SR-IOV is disabled and replaced with a standard virtio-net adapter.

D.

The failover fails during the validation phase because SR-IOV VMs cannot be protected.