Power Up Your Study Prep: Black Friday 75% Discount! Use coupon code below to save! - Ends in 0d 00h 00m 00s - Coupon code: big75certs

HP HPE7-A12 Actual Questions

Page: 3 / 5
Total 70 questions

HPE Network Data Center Professional Architect Exam Questions and Answers

Question 9

You have designed an L3 spine-and-leaf topology for a customer’s highly virtualized VMware vSphere data center. The customer already uses HPE Aruba Networking mobility and switching solutions in the campus. You are recommending CX 8325 and CX 9300 switches and Fabric Composer. The customer asks you to justify the cost of the Fabric Composer licenses.

What should you explain?

Options:

A.

This solution enables the customer to monitor the data center and campus solutions from the same cloud console, eliminating travel costs.

B.

This solution ' s deep integration with vSphere saves IT time and eliminates costly errors with features like automatic VLAN provisioning.

C.

This solution ' s integration with ITSMs such as ServiceNow helps customers troubleshoot more quickly.

D.

This solution uses agentic AI to run the network automatically, reducing IT operational costs.

Question 10

A customer’s legacy three-tier architecture is being modernized with an L3 spine-and-leaf topology. The CX switches in the topology will supply the overlay. The customer data center has six VRFs. The customer has requested service leaf switches to connect to two clustered firewalls that route and filter traffic between the VRFs.

How can the efficiency of traffic flow between subnets in the same VRF be maximized?

Options:

A.

Use the centralized gateway model for these subnets, selecting a different centralized gateway for each VRF

B.

Within each VRF, use the distributed gateway (L3 anycast) model for most subnets but the centralized gateway design for the subnets with the highest security needs

C.

Use the firewall cluster as centralized gateways for these subnets

D.

Use the distributed gateway (L3 anycast) model for these subnets

Question 11

Order the severity levels (highest impact on top) into the righthand box.

Drag & Drop

Options:

Question 12

Waratah Hospital, located in Australia, plans to move many data-center services to a new facility. (The remaining legacy data center is not included in this project.) Waratah Hospital has hired an external consultant to help design the new data-center network.

Based on the data-center network-infrastructure requirements, the external consultant has produced a high-level design. The following summarizes the design document.

Requirements and information:

Six racks in the data-center room (a single row).

Redundant top-of-rack leaf switches with back-to-front cooling in every rack, providing 10/25 Gbps connectivity to servers, storage, and other devices.

Four 100 GbE uplinks per leaf switch.

The customer requested that all switch ports face the back of the rack racks (hot aisle).

OOB management for servers, storage, and network must be provided through an external switch with back-to-front cooling. This switch must be included in the solution. One OOB switch provides connectivity for two racks.

Core equipment for the OOBM network is being reused.

Middle-of-row spine switches.

The data center must connect to the hospital building using links that provide 400 Gbps.

Internet access is supplied through an existing firewall cluster with two firewalls, with one firewall in each data room. The second firewall operates in standby mode, and VRRP is used on the firewalls for failover. The data-center network must connect to these firewalls using links totaling 100 Gbps.

The external link is a dark-fiber direct link based on single-mode fiber (OS2). The distance to the main hospital is 1.5 KM. The links will terminate on two core switches in the hospital.

The customer also requires:

99.999% uptime for this life-critical environment.

Planned and unplanned downtime must be minimized.

Software upgrades are permitted only once per year with close to zero downtime.

All life-critical resources are accessed locally, and all resources reside within the hospital campus.

Waratah Hospital requires a highly secure data-center environment. Encrypted wire-speed connectivity between the data room and the hospital is mandatory because the link between the buildings crosses a public road.

Waratah Hospital has a mix of virtualized (vSphere) servers, Nutanix storage, bare-metal servers, backup servers, and other devices.

In the past, the hospital experienced a security breach that resulted in data loss, network downtime, and identity theft.

Given the scenario, which environmental requirements are stated? Choose two.

Options:

A.

traffic micro-segmentation

B.

encrypted connectivity

C.

switch placement

D.

available power to racks

E.

airflow direction

Page: 3 / 5
Total 70 questions