Month End Sale Special - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big75certs

H13-629_V3.0 Questions Bank

HCIE-Storage V3.0 Questions and Answers

Question 17

When planning a disaster recovery (DR) system, DR levels need to be divided based on service continuity requirements and cost investment. Which of the following statements about DR levels are true?

Options:

A.

In service-level DR, all service links are redundant, including links between IT systems and non-IT systems such as office facilities and personnel.

B.

Application-level DR consists of building the same application systems at the DR site.

C.

In data-level DR, the remote DR center can be simply considered as a remote data backup center.

D.

In data-level DR, services are not interrupted if a disaster occurs.

Question 18

An enterprise has deployed a Huawei all-flash storage system to carry service data. During routine O & M, an engineer discovered a steady yellow link indicator on an Ethernet port of the storage device. Then, the engineer logged in to DeviceManager, checked the rear view of the storage device, and found that the running status of the Ethernet port was " Link down " . In this scenario, the problem may be caused by incorrect IP address configuration for either the logical port or the service network port on the application server.

Options:

A.

TRUE

B.

FALSE