Question 45

A standard WLAN project lifecycle includes requirements clarification, HLD, site survey, LLD, network deployment, network optimization, and acceptance test. In the requirements clarification phase, which of the following information needs to be collected in the requirements collection table?

Options:

A.

Switch position, AP installation positions, and power supply mode

B.

Service types

C.

Floor plan of coverage areas

D.

Bandwidth requirements, including the total number of STAs, per-STA bandwidth requirements, and network concurrency rate

E.

Terminal types and quantity

F.

Laws and regulations of the place where the network is located

Question 46

Which of the following items is not involved in the HLD phase?

Options:

A.

Capacity planning

B.

Network design

C.

AP position planning

D.

Deployment planning

Question 47

Which of the following algorithms 15 not supported by Cipher Suite B of WPA3-Enterprise?

Options:

A.

GCMP-256

B.

SHA394

C.

SHA256

D.

GMAC-256

Question 48

In on-demand routing mode on a mesh network, which of the fallowing types of frames is broadcast by the source node to establish a route to the destination node?

Options:

A.

DHCP

B.

DNS

C.

PREP

D.

PREQ