Big Black Friday Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

OMG OMG-OCSMP-MBI300 Exam With Confidence Using Practice Dumps

Exam Code:
OMG-OCSMP-MBI300
Exam Name:
OMG-Certified Systems Modeling Professional - Model Builder – Intermediate
Certification:
Vendor:
Questions:
90
Last Updated:
Nov 27, 2025
Exam Status:
Stable
OMG OMG-OCSMP-MBI300

OMG-OCSMP-MBI300: OMG Certification Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the OMG OMG-OCSMP-MBI300 (OMG-Certified Systems Modeling Professional - Model Builder – Intermediate) exam? Download the most recent OMG OMG-OCSMP-MBI300 braindumps with answers that are 100% real. After downloading the OMG OMG-OCSMP-MBI300 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the OMG OMG-OCSMP-MBI300 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the OMG OMG-OCSMP-MBI300 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (OMG-Certified Systems Modeling Professional - Model Builder – Intermediate) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA OMG-OCSMP-MBI300 test is available at CertsTopics. Before purchasing it, you can also see the OMG OMG-OCSMP-MBI300 practice exam demo.

Related OMG Exams

OMG-Certified Systems Modeling Professional - Model Builder – Intermediate Questions and Answers

Question 1

Choose the correct answer.

The essentials of a laptop battery capacity model are shown In the following diagrams (where the value types W, h and Wh stand for watl, hour, and watt-hour respectively). Assume that the instance values shown are inputs, and that nothing relevant has been omitted.

The designer needs to determine what the energy_capacity of battery 1 should be to enable a laptop usage_time_capacity time of 8 hours. Which combination of the options listed in the text box in the figure will achieve this Intent with minimal changes (including minimal new aspects)?

Options:

A.

O1.1 and O2 1

B.

O1.1 and O2 2

C.

O1 1 and O2 3

D.

O1.2 and O2.1

E.

O1 7 and O2.2

F.

O1.2 and O2.3

G.

O1 3 and O2 3

Buy Now
Question 2

Choose the correct answer.

The formula for the determinant of a square 2X2 matrix.

|ab|

|cd|

is a'd-b'c A subsystem receives one message for each value (i e. a(v) b(v). c(v) and d(v) where v is a real number) These messages can be in any order, and the ensure sequence is followed by an "end" message. The subsystem must calculate the determinant and output it upon receipt of the end message If there are multiple messages for one value (e g . two a(v) messages), or the end message is received before all values have been received, the subsystem should signal an error.

Which state machine correctly models the required behavior? If more than one slate machine is correct, select the one with the fewest slates.

A)

B)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Question 3

Choose the correct answer

How can the containment relationship be used to relate requirements?

Options:

A.

Packages may represent specifications, which can be contained m other specifications

B.

Containment allows a requirement to be decomposed by containing sub-requirements. Packages can also contain requirements

C.

Requirements can contain packages, which in turn can contain other requirements. This is how hierarchical specifications can be represented in SysML

D.

Requirements cannot use containment. They cannot contain any other model elements.