Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

EMC D-SNC-DY-00 Exam With Confidence Using Practice Dumps

Exam Code:
D-SNC-DY-00
Exam Name:
Dell SONiC Deploy Exam
Certification:
Vendor:
Questions:
45
Last Updated:
Feb 24, 2026
Exam Status:
Stable
EMC D-SNC-DY-00

D-SNC-DY-00: Networking Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the EMC D-SNC-DY-00 (Dell SONiC Deploy Exam) exam? Download the most recent EMC D-SNC-DY-00 braindumps with answers that are 100% real. After downloading the EMC D-SNC-DY-00 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the EMC D-SNC-DY-00 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the EMC D-SNC-DY-00 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (Dell SONiC Deploy Exam) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA D-SNC-DY-00 test is available at CertsTopics. Before purchasing it, you can also see the EMC D-SNC-DY-00 practice exam demo.

Dell SONiC Deploy Exam Questions and Answers

Question 1

Which two elements are configured when RoCE is enabled?

Options:

A.

IB

B.

ETS

C.

PFC

D.

TCP

Buy Now
Question 2

A customer must configure a peer link between two switches in the L2 MC-LAG scenario.

SwitchB has already been configured. Configure the peer link on SwitchA.

Use the following configuration information:

MC-LAG domain 1

VLAN 101

Peer link Port-Channel 100

SwitchA IP: 192.168.1.1/24

SwitchB IP: 192.168.1.2/24

MC-LAG system MAC: 00:00:00:11:11:11

The physical ports to connect the peer switch are Eth 1/5 and Eth 1/6 for each switch.

Options:

Question 3

Create port channel 10 on interfaces Eth 1/11 and 1/12, so that it connects to an already configured switch. A server will be connected on Eth 1/1. Both the server and port channel need VLAN 1 untagged and only VLAN 10 tagged.

Complete the configuration on Switch A.

Options: